Elevator shaft cladding with CETRIS® boards
Use
Elevator shaft cladding with CETRIS® boards
Steel structures of elevator shafts may be clad with various materials.
Recently, however, use of CETRIS® cement bonded particleboards has prevailed, especially for their excellent properties and above all for the saved time, effort and money.
- Certified system for elevator shafts based on long-term experience
- Non-flammable material – all types of CETRIS®® boards are classified A2 for fire resistance
- Dry and quick assembly
- Formates according to customer requirements
- No glued joints
- Minimum interference with existing load-bearing structure
- Cladding with CETRIS® boards only increases the ground size of the shaft with the board thickness (12mm) – thus the narrowing of the staircase flight and landing is minimal
- Simple surface finish (no need for cementing, grinding, plastering...)
- First-class modern appearance of the elevator shaft
- Professional consultancy
The steel structure utilizes cold-rolled galvanized steel sections, which allow for the construction not only of the supporting framework for the cladding of steel halls, but also of prefabricated interior walls with excellent sound insulation properties, and, most importantly, load-bearing exterior walls and ceilings for buildings up to three stories high. Lightweight steel structures are a modern building system characterized by simple and rapid assembly, flexibility, and a wide variety of exterior designs, all while being environmentally friendly.
More informations: